- Site address marked, for locations see permit condition
|
|
- Mason County approved building plans and site plan
|
- Electrical approved by Labor & Industries
|
- Framing of structure complete: Structure weathered in - windows & doors installed, siding installed, notching & boring of wall, roof, and floor framing members completed, truss bracing installed per manufacturer, hold downs, anchor bolts and other required hardware installed per plan
|
- Manufacturer specifications on-site including truss, fireplace/stove, furnace, etc.
|
- Braced wall/shear panels installed per plan, interior braced wall panels properly connected to floor and ceiling.
|
- Whole house and spot ventilation system
|
- Attic & crawl space ventilation installed
|
|
- Fire blocking installed where required
|
- Stairways installed with proper rise, run & width
|
- Windows safety glazed where required
|
- Egress windows installed in sleeping rooms
|
- Wash. State Energy Code (WSEC) air sealing done
|
- Mechanical & plumbing contractors license number
|
- Combustion air openings, where required
|
- HVAC Ducts installed, sealed and insulated
|
- Equipment in garage, min. of 18" above floor & protected vehicle damage.
|
|
- Propane tank installed with proper setbacks
|
- Chimneys, flues, stacks and B-vent, installed per manufacturer specifications & insulation dams installed where needed.
|
- Wallboard installed behind mechanical equipment where located at firewall.
|
- DWV 1/4" slope per foot of pipe.
- Ceiling insulation baffles installed.
|
- Plumbing & mechanical equipment anchored & installed per manufacturer specifications.
|
- Plumbing system roughed-in to code and under test.
|
- Exhaust fans installed, insulated where required, and vented to exterior
- Fire Marshal approval for cover when required.
|
|
|